Shop

  • APC Smart-UPS RT 192V 32x5Ah BP without Rail kit

    APC Smart-UPS RT 192V 32x5Ah BP without Rail kit

    1,645.00 $
    Colour: Black
    Dimension: 13(h) x 44(w) x 68.3(d) cm
    Mounting Mode: Rack-mounted
    U Size: 3U
    Compatible with: SRTG10KXLI
    Availability: Ex-stock
    Read moreLoading Done
  • APC Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack

    APC Smart-UPS SRT 192V 5kVA and 6kVA Battery Pack

    1,800.00 $
    Colour: Black
    Dimension: 43.2(h) x 13(w) x 68.27(d) cm
    Mounting Mode: Rack-mounted with kit
    Compatible with: SRT5KRMXLW-HW
    Availability: Ex-stock
    Read moreLoading Done
  • APC SRV Batt Pack SRV72BP-9A Tower Case

    APC Easy SRV 72V Battery Pack for 2&3kVA Tower, No Battery Model (10min) Ext. Runtime Model

    528.00 $
    Additional Backup Time: 10 Minutes
    Physical: 33.6 (h) x 19 (w) x 42.5cm (d) (2U)
    Weight: 38kg
    Rail Kit: Tower Case
    Availability: Ex-stock until stock last (back order 4-6 weeks)
    Read moreLoading Done
  • APC SRV Battery Module SRV72BP-9A

    APC Easy SRV RM 36V Battery Pack for 1 kVA SRV UPS (30min) Ext. Runtime Model

    415.00 $
    Additional Backup Time: 30 Minutes
    Physical: 8.6 (h) x 43.8 (w) x 41.2cm (d) (2U)
    Weight: 21kg
    Rail Kit: Included
    Availability: Ex-stock until stock last (back order 4-6 weeks)
    Read moreLoading Done
  • Network Card for Easy UPS 3S, 3M, 3L and Galaxy PW 2nd Gen UPS

    Network Card for Easy UPS 3S, 3M, 3L and Galaxy PW 2nd Gen UPS

    433.00 $
    Compatible With: Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS
    Physical: 12.7(h) x 20.3(w) x 12.7(d) cm
    Weight: 0.91kg
    Availability: Back order (6 – 8 Weeks)
    Read moreLoading Done
  • DCX Professional Services

    DCX Professional Services

    3,269.00 $

    1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…

Need Help? Chat with us