Empty Battery Cabinet, 700mm wide
4,470.00 $| Colour: | White |
| Dimension: | 197(h) x 70(w) x 85(d) cm |
| Compatible with: | Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
| Availability: | Ex-stock (till stock last) |
Showing 1–12 of 18 results

| Colour: | White |
| Dimension: | 197(h) x 70(w) x 85(d) cm |
| Compatible with: | Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
| Availability: | Ex-stock (till stock last) |

| Colour: | Black |
| Dimension: | 197(h) x 110(w) x 85(d) cm |
| Compatible with: | Easy UPS 3-Phase Modular |
| Availability: | Ex-stock (till stock last) |

| Colour: | White |
| Dimension: | 197(h) x 110(w) x 85(d) cm |
| Compatible with: | Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
| Availability: | Ex-stock (till stock last) |

| Type: | Battery cabinet with VRLA batteries |
| Compatible with: | Easy UPS 3M UPS and Easy UPS 3L UPS |
| Dimension: | 189.5(h) x 200.4(w) x 84.5(d) cm |
| Mounting Mode: | Not rack-mountable |
| Availability: | 10 weeks |

| Physical: | 155.4(h) x 100.1(w) x 100.1(d) cm |
| Input Voltage: | 400 V |
| Compatible Indoor Units: | ACRD301S and ACRD301P |
| Availability: | 12 weeks (Ex-stock until stock last) |

| Colour: | Black |
| Physical: | 199.1(h) x 30(w) x 109.5(d) cm |
| Input Power: | 850 W |
| Compatible Outdoor Unit: | ACCU30201 |
| Compatible Sensing Cable: | NBES0308 |
| Availability: | 12 weeks (Ex-stock until stock last) |

| Colour: | Black |
| Physical: | 199.1(h) x 30(w) x 109.5(d) cm |
| Input Power: | 850 W |
| Compatible Outdoor Unit: | ACCU30201 |
| Compatible Sensing Cable: | NBES0308 |
| Availability: | 12 weeks (Ex-stock until stock last) |

| Physical: | 68.6(h) x 90.1(w) x 45.7(d) cm |
| Mounting Mode: | Not rack-mountable |
| Availability: | 12 weeks (Ex-stock until stock last) |

| Colour: | Black |
| Physical: | 199.1(h) x 30(w) x 109.5(d) cm |
| U Size: | 42U |
| Mounting Mode: | Not rack-mountable |
| Availability: | 13 weeks (Ex-stock until stock last) |

| Type: | Battery module |
| Dimension: | 15.7(h) x 42.8(w) x 76(d) cm |
| Mounting Mode: | Not rack-mountable |
| Availability: | Ex-stock |

1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…

| Type: | Maintenance |
| Support: | Easy UPS 3S |
| Availability: | Ex-stock |
| UPS rating: | Choose (kVA) |